APPLICATION
Application time for dryshake products is influenced by every variable which affects the placing of concrete, and can therefore vary substantially, depending on the prevailing conditions.
Dependent on the conditions, remove the surface bleed water or allow it to evaporate. Sprinkle Sika® Chapdur IN onto the screed concrete evenly in 2 stages, first stage 60% and second stage 40%. Care must be taken to apply the product without creating ripples etc. in the concrete surface. The first application must be worked into the slab immediately followed by application of the second stage quantity of Sika® Chapdur IN. Final finishing, closing pores and removing undulations can be achieved either by hand or powered trowel.
Please also note:
- Never add water to the surface where the dry shake has been applied.
- Sika® Chapdur IN results in the slab surface becoming stiff more quickly than usual. Careful trimming must take place along the edges where adjoining slabs are to be poured.
Periodical checking of the condition and development of the concrete will determine the correct time frame for each stage and sequence of application.
For mechanical application with automatic spreader and laser screed, the spreading can start almost immediately after the concrete has been levelled to allow for the hydration of the dryshake. Compaction with the trowel can start as soon as the weight of the power trowels is supported by the concrete.
For manual application, the dryshake must be spread once the concrete can be stepped on, without leaving a print deeper than 3–5 mm.