APPLICATION
IMPORTANT
Avoid application in direct sun and/or strong wind.
IMPORTANT
Protect freshly applied material from rain etc.
IMPORTANT
During application, the mixture of SikaLatex® SBR and cement needs to be continuously stirred to prevent the cement particles from settling.
Waterproofing coating
- Thoroughly pre-wet the prepared substrate. Keep the surface wet and do not allow to dry.
- Before application remove excess water e.g. with a clean sponge. The surface shall appear a dark matt appearance without glistening and surface pores and pits shall not contain water.
- Prepare the waterproofing coating as indicated in the consumption table. Using a stiff clean brush spread the coating vigorously onto the substrate, forming a thin layer.
- After 2 to 6 hours, apply the second coat in crosswise direction to first coat. Standard coating system can be further reinforced by placing glass fabric layer Sika® Fabric-50 in between first and second coat.
- Protect with screed on top for longer life.
NOTE:
- In areas of severe water penetration, three coats might be required.
Bonding coat
IMPORTANT
Never use pure SikaLatex® SBR or SikaLatex® SBR-water mix directly onto the substrate as bonding agent, always add cement and sand to the mix.
- Thoroughly pre-wet the prepared substrate. Keep the surface wet and do not allow to dry.
- Before application remove excess water e.g. with a clean sponge. The surface shall appear a dark matt appearance without glistening and surface pores and pits shall not contain water.
- Prepare the bonding coat as indicated in the consumption table. Using a stiff clean brush work the mix vigorously onto the substrate, forming a thin layer filling all unevenness, pits and pores.
- When the bond coat is still fresh and sticky, apply the mortar or concrete. Vibrate carefully to achieve satisfactory interpenetration of mortar and concrete.
Polymer mortar or Waterproof plaster
- Prepare the polymer mortar as indicated in the consumption table.
- Apply a thin layer of polymer mortar as given above.
- Apply the mortar onto the surface in a layer of max. 20 mm thickness.
- Cured mortar or plaster with SikaLatex® SBR would harden faster and would be watertight. For higher thickness, apply in multiple layers at intervals of 12 hours.
Polymer concrete or Screed
- Thoroughly pre-wet the prepared substrate. Keep the surface wet and do not allow to dry.
- Before application remove excess water e.g. with a clean sponge. The surface shall appear a dark matt appearance without glistening and surface pores and pits shall not contain water.
- Prepare the bonding coat as indicated in the consumption table. Using a stiff clean brush work the mix vigorously onto the substrate, forming a thin layer filling all unevenness, pits and pores.
- Prepare the concrete or screed as indicated in the consumption table. When the bond coat is still fresh and sticky, apply the concrete. Vibrate carefully to achieve satisfactory interpenetration concrete or screed.
Polymer cement injection grout
- Open the crack lines to form a V groove of ~10 mm.
- Seal the cracks with Sika MonoTop®-108 Water Plug IN mortar or Sikadur®-31 IN.
- Fix appropriate nozzles spaced at regular intervals along groove length with Sika MonoTop®-108 Water Plug IN mortar or Sikadur®-31 IN.
- Prepare a cement grout slurry as indicated in the consumption table.
- Inject the grout as per standard grouting practice.
CURING TREATMENT
- Avoid rapid evaporation of the water from mortars prepared with SikaLatex® SBR. Cover the surface with a polyethylene film, use wet burlap, gunny bag or hessian cloth or water misting or apply Sika Antisol® curing compound.
- Cure for minimum 3–5 days. DO NOT pond with water before 5 days of curing.
- During adverse weather conditions (high temperatures, low relative humidity, wind, sun etc.) take particular care with curing treatment.