Sikalastic®-10 Primer EP
Solvent free epoxy primer for Sikalastic® and SikaShield® membranes
Sikalastic®-10 Primer EP is a two component, 100% solids, solvent free epoxy primer for use with various Sikalastic® liquid applied membranes and SikaShield® membranes. Sikalastic®-10 Primer EP is low viscosity and promotes substrate penetration to provide excellent adhesion in demanding applications.
- Low viscosity
- Good substrate penetration
- Excellent adhesion to concrete
- Stabilizes cementitious substrates
- Solvent free
- Easy to apply
- Short waiting times
- Multi-purpose
- Can be mixed with quartz sand for use as scratch coat, levelling layer or repair mortar
Usage
Sikalastic®-10 Primer EP may only be used by experienced professionals.- For priming low to medium absorbent substrates
- For priming concrete substrate, cement screeds and epoxy mortars
- For priming metal substrates followed by sand broadcast
- For use as primer followed by sand broadcast before SikaShield® range of APP bituminous membranes
- For usage with Sikalastic® range of liquid applied membranes
- Binder for scratch coat, levelling layer and repair mortar
Advantages
- Low viscosity
- Good substrate penetration
- Excellent adhesion to concrete
- Stabilizes cementitious substrates
- Solvent free
- Easy to apply
- Short waiting times
- Multi-purpose
- Can be mixed with quartz sand for use as scratch coat, levelling layer or repair mortar
Packaging
Part A+B | 20 kg |
Part A | 15.8 kg container |
Part B | 4.2 kg container |
Colour
Part A+B mixed | Liquid, brownish-transparent |
Part A | Liquid, brownish-transparent |
Part B | Liquid, transparent |
Product Details
Chemical base
Epoxy resin with special fillers
Shelf life
12 months from date of production
Storage conditions
The product must be stored in original, unopened and undamaged sealed packaging in dry conditions at temperatures between +10 °C and +30 °C.
Density
Part A+B mixed | ~1.4 kg/L |
Part A | ~1.6 kg/L |
Part B | ~1.0 kg/L |
All density values at +27 °C
Solid content by weight
~100 %
Solid content by volume
~100 %
System structure
Note: Sikalastic®-10 Primer EP can be applied in different waterproofing system build ups for concrete or metal substrates. Contact Sika Technical Services for additional information.
Cementitious substrates
Layer | Product |
Primer | Sikalastic®-10 Primer EP + broadcast Sika® Quartz 02 IN |
Levelling layer or scratch coat (optional, depending on surface quality) | Sikalastic®-10 Primer EP + mix Sika® Quartz 01 IN + broadcast Sika® Quartz 02 IN |
Liquid applied membrane or Bitumen membrane | Respective Sikalastic® or SikaShield® membrane |
Metal substrates
Layer | Product |
Primer | Sikalastic®-10 Primer EP + Sika® Quartz 01 IN |
Liquid applied membrane | Respective Sikalastic® membrane |
Shore D hardness
~76 (7 days, +27 °C) | (ASTM D2240) |
Tensile adhesion strength
> 1.5 N/mm2 (concrete failure) | (EN 1542) |
Dry film thickness
Substrate | Coating type | Thickness |
Cementitious | Primer | ~0.3–0.4 mm |
Cementitious | Levelling layer | ~1.0 mm |
Metal | Primer | ~0.2 mm |
Application
Mixing ratio
Part A : Part B = 79 : 21 (by weight)
Ambient air temperature
+8 °C min. / +35 °C max.
Relative air humidity
80 % max.
Dew point
Beware of condensation!
The substrate and uncured floor must be at least 3 °C above dew point to reduce the risk of condensation or blooming on the floor finish.
Note: Low temperatures and high humidity conditions increase the probability of blooming
Substrate temperature
+8 °C min. / +35 °C max.
Substrate moisture content
≤ 4 % parts by weight
Test methods: Sika®-Tramex meter, CM-measurement or Oven-dry-method. No rising moisture according to ASTM (Polyethylene-sheet).
Pot life
Temperature | Time |
+10 °C | ~50 min |
+20 °C | ~25 min |
+30 °C | ~15 min |
Waiting time / Overcoating
Before applying solvent free products on Sikalastic®-10 Primer EP allow:
Substrate temperature | Minimum | Maximum |
+10 °C | 24 h | 4 d |
+20 °C | 12 h | 2 d |
+30 °C | 8 h | 24 h |
Before applying solvent containing products on Sikalastic®-10 Primer EP allow:
Substrate temperature | Minimum | Maximum |
+10 °C | 36 h | 6 d |
+20 °C | 24 h | 4 d |
+30 °C | 16 h | 2 d |
Note: Times are approximate and will be affected by changing ambient conditions particularly temperature and relative humidity.
Consumption
Cementitious substrates
Application type | Product | Consumption of mix |
Primer | Sikalastic®-10 Primer EP + broadcast Sika® Quartz 02 IN | ~0.30–0.50 kg/m2 |
Levelling layer or scratch coat | Sikalastic®-10 Primer EP + 2 pbw Sika® Quartz 01 IN + broadcast Sika® Quartz 02 IN | ~1.0–1.2 kg/m2 |
Repair mortar | 1 pbw Sikalastic®-10 Primer EP + 4 pbw Sika® Quartz 01 IN | ~2.2 kg/m2 per mm |
pbw = parts by weight
Metal substrates
Application type | Product | Consumption of mix |
Primer | Sikalastic®-10 Primer EP + broadcast Sika® Quartz 01 IN | ~0.20–0.25 kg/m2 |
Quartz sand recommendation:
- When overlay is with liquid applied membranes, use medium broadcast ~0.8 kg/m2
- When overlay is with bitumen membranes, use full broadcast ~2 kg/m2
Note: These figures are theoretical and do not allow for any additional material required due to surface porosity, surface profile, variations in level or wastage etc.
APPLICATION INSTRUCTIONS
Strictly follow installation procedures as defined in method statements, application manuals and working instructions which must always be adjusted to the actual site conditions.
EQUIPMENT
Sikalastic®-10 Primer EP must be thoroughly mixed using a low speed electric stirrer (300 - 400 rpm) or other suitable equipment. For the preparation of mortars use a forced action mixer of rotating pan, paddle or trough type. Free fall mixers should not be used.
SUBSTRATE PREPARATION
Cementitious substrates
- The concrete substrate must be sound and of sufficient compressive strength (minimum 25 N/mm2) with a minimum pull off strength of 1.5 N/mm2.
- The substrate must be clean, dry and free of all contaminants such as dirt, oil, grease, coatings and surface treatments, etc.
- Concrete substrates must be prepared mechanically using abrasive blast cleaning or scarifying equipment to remove cement laitance and achieve an open textured surface.
- High spots must be removed by grinding.
- Weak concrete must be removed and surface defects such as blowholes and voids must be fully exposed.
- Repairs to the substrate, filling of blowholes/voids and surface levelling must be carried out using appropriate products from the Sikafloor®, Sikadur® and Sikagard® range of materials.
- All dust, loose and friable material must be completely removed from all surfaces before application of the product, preferably by brush and/or vacuum.
Metal substrates
- The substrate must be clean, dry and free of all contaminants such as dirt, oil, grease, coatings and surface treatments, etc.
- Any rust must be carefully removed by wire brushing or using Sika® Rustoff-100, followed by power washing.
- Any damaged metal must be repaired or replaced as suitable.
MIXING
Primer
- Prior to mixing, stir part A mechanically.
- When all of part B has been added to part A, mix continuously for 3 minutes until a uniform mix has been achieved. Over mixing must be avoided to minimise air entrainment.
Levelling layer and Repair mortar
- Prior to mixing, stir part A mechanically.
- When all of part B has been added to part A, mix continuously for 3 minutes until a uniform mix has been achieved.
- When parts A and B have been mixed, add the quartz sand and mix for a further 2 minutes until a uniform mix has been achieved.
- To ensure thorough mixing pour materials into another container and mix again to achieve a consistent mix. During the final mixing stage, scrape down the sides and bottom of the mixing container with a flat or straight edge trowel at least once to ensure complete mixing. Over mixing must be avoided to minimise air entrainment.
APPLICATION
Prior to application, confirm substrate moisture content, r.h. and dew point. If moisture content > 4 % pbw, Sikafloor® EpoCem® may be applied as a T.M.B. (temporary moisture barrier) system.
Primer
- Pour mixed primer onto the prepared substrate and apply by brush, roller or squeegee then back roller in two directions at right angles to each other. Ensure a continuous, pore free coat covers the substrate. If necessary, apply two priming coats.
- Immediately broadcast quartz sand on wet primer.
- Remove excess sand after primer is cured.
Levelling layer or scratch coat
- Pour the mixed scratch coat material onto the prepared substrate and apply by trowel or squeegee. Ensure a continuous, pore free coat covers the substrate. If necessary, apply two coats.
- Immediately broadcast quartz sand on wet scratch coat.
- Remove excess sand after scratch coat is cured.
Repair mortar
- Apply the repair mortar screed evenly on the substrate, using levelling battens and spatula as necessary.
- After a short waiting time compact and smoothen the mortar with a trowel.
CLEANING OF TOOLS
Clean all tools and application equipment with Thinner C immediately after use. Hardened or cured material can only be mechanically removed.